亚洲国产精品自在在线观看|久久亚洲国产精品五月天婷婷|狠狠狠久久久免费观看|欧美激情中文字幕精品自拍

    <b id="ojcb4"><legend id="ojcb4"></legend></b>

    <b id="ojcb4"><meter id="ojcb4"></meter></b>

      Changji-Guquan transmission link to be finished within 2018

      Source: Xinhua| 2018-02-06 21:48:25|Editor: pengying
      Video PlayerClose

      CHINA-CHANGJI-GUQUAN UHVDC TRANSMISSION LINK (CN)

      Aerial photo taken on Feb. 6, 2018 shows the construction at the south bank of the Yangtze River of the Changji-Guquan UHVDC (ultra-high voltage direct current) transmission link in Digang Town under Fanchang County, east China's Anhui Province. The ±1100 kv Changji-Guquan transmission link will set a world record in terms of voltage level, transmission capacity and distance. The link is expected to be finished within 2018 with the installation capacity of 12,000 megawatts. (Xinhua/Guo Chen)

         1 2 3 4 5 6 Next  

      KEY WORDS: voltage level
      EXPLORE XINHUANET
      010020070750000000000000011100001369538321